CRBC News
Science

Can the U.S. Plant a Flag on the Moon Before Trump’s Term Ends? Artemis, Jared Isaacman and the Private-Sector Push

Can the U.S. Plant a Flag on the Moon Before Trump’s Term Ends? Artemis, Jared Isaacman and the Private-Sector Push
‘2026 was already destined to become a standout year in space.’Photograph: Geoffrey Swaine/Shutterstock

President Trump has called for “American space superiority,” including planting the U.S. flag on the Moon before the end of his second term, and Jared Isaacman was confirmed as NASA administrator. Artemis 2 targets a February–April 2026 circumlunar flight and Artemis 3 aims for a mid-2027 lunar landing with four crew. Private-public partnerships — led by SpaceX and Blue Origin — will be central, but agency disruption, budget uncertainty and the technical challenge of lunar landings make success uncertain.

2026 was already shaping up to be a milestone year for human spaceflight: Artemis 2 is expected to carry astronauts around the Moon for the first time in more than half a century, and private industry is playing an increasingly central role in returning Americans to lunar orbit and, ultimately, the surface.

That momentum sharpened after a pre-holiday directive from President Donald Trump calling for “American space superiority,” including an explicit goal to plant the U.S. flag on the Moon before the close of his second term. Combined with the December confirmation of billionaire private astronaut Jared Isaacman as NASA administrator and an expanding role for tycoon-led commercial firms, the coming months could mark one of the most consequential stretches in space policy and exploration in a generation.

Isaacman’s Confirmation and the Political Context

Isaacman’s confirmation, which followed a protracted nomination process, was widely read as a political capstone to an administration policy that emphasizes beating China to the lunar surface. China’s Chang’e program is aiming for a lunar landing around 2030. After his confirmation, Isaacman posted on X: “Our number one priority: American leadership in the high ground of space.” He has signaled support for the existing Artemis architecture while acknowledging that long-term reliance on the Space Launch System (SLS) is unsustainable.

Timelines, Rockets and Bottlenecks

Artemis 2 is approaching the launch pad with a targeted window between February and April 2026 for a crewed circumlunar flight. Artemis 3, which would land four crew members — including the first woman and the first person of color to walk on the Moon — is currently scheduled for a mid-2027 lunar descent.

Only a year ago the future of NASA’s SLS rocket looked uncertain: the program is over-budget and delayed, and many urged switching to commercial heavy-lift systems such as SpaceX’s Starship. Isaacman told senators that SLS is the fastest near-term path back to the Moon but conceded it is not a sustainable long-term solution. Many experts expect a phased transition to commercial heavy-lift services, but political and symbolic milestones could delay that shift.

“Landing is a lot harder, particularly landing on a different celestial body,” said Casey Dreier, director of space policy at the Planetary Society. “We’ve put a huge amount of national prestige, policy and to some extent national security planning around the fact that one or two companies who’ve never done this before will do this for us.”

Dreier warned that NASA’s success is far from guaranteed after a turbulent year for the agency that included staffing cuts, a controversial budget proposal for science that Congress rejected, and a drawn-out confirmation for Isaacman. Those disruptions, he said, cost the agency valuable time and expertise.

Private Sector Momentum—and Risks

Private companies are already central to the Artemis roadmap. SpaceX is building a human landing system (HLS) for Artemis 3 and 4, runs frequent crewed missions to the International Space Station (ISS), and continues to expand Starlink. In 2025 SpaceX set a record with 165 launches in a single year (excluding a handful of Starship tests).

Blue Origin demonstrated New Glenn’s launch capability in November and plans a test flight of its Blue Moon lander; Blue Moon is NASA-selected for Artemis 5 no earlier than March 2030. Other commercial players, such as Virgin Galactic, are repositioning their plans with new vehicles in development.

Experts highlight the promise of public-private partnerships but also the danger of overreliance on a very small number of companies for mission-critical capabilities — especially landing systems, which involve complex, one-shot engineering and high risk.

Policy Priorities and What To Watch

Space policy analysts have recommended a set of near-term priorities to stabilize and accelerate U.S. efforts: a phased retirement of SLS with procurement of commercial heavy-lift from at least two providers; leasing privately owned low-Earth-orbit stations by 2028 to prepare for the ISS retirement around 2030; commercial lunar communications and navigation services before 2030; and demonstration missions for commercial resource acquisition, including rare-earth material return from asteroids and privately operated nuclear power on the Moon by 2030.

If Artemis 2 and Artemis 3 proceed on schedule, 2026–2027 could be pivotal. But political directives, agency turbulence, budget pressures and the technical difficulty of lunar landing mean that planting a U.S. flag before the end of a presidential term remains an ambitious, uncertain goal.

What To Watch Next: Artemis 2 launch readiness in early 2026; Artemis 3 integration and HLS testing; Isaacman’s policy decisions on SLS vs. commercial services; NASA staffing and budget moves; and key private-sector tests such as Blue Moon and additional Starship demonstration flights.

Help us improve.

Related Articles

Trending